A free SEO website that pulls EICR, rewires, and EV-charger jobs to your inbox.
You're NICEIC or NAPIT registered. Part P certified. Your work is sound. But the EICR, rewire, and EV-charger jobs are going to electricians who rank above you. We build you the SEO website that owns those searches, free in 5 working days, £197/mo + VAT.
- Service-tier pages: EICR, rewires, fuse-board upgrades, EV chargers, smart-home, emergency
- NICEIC / NAPIT / Part P trust signals placed correctly
- Borough and town coverage that compounds month after month
- Call tracking and form analytics on every page
- 90-day qualified-lead guarantee in writing
How does a free electrician website work?
£0 upfront, £197/mo + VAT (12-month plan), site live in 5 working days. We build dedicated pages for the electrical searches in your area: EICR, rewires, fuse boards, EV chargers, smart-home, emergency call-outs. Each page targets the specific phrasing customers type into Google.
Your NICEIC or NAPIT registration number, Part P qualification, public liability, and warranty terms are integrated correctly. 90-day qualified-lead guarantee in writing.
Three reasons your phone isn't ringing.
Your homepage tries to be everything to everyone. “Electrical services across South London” ranks for nothing. Google ranks for specifics: EICR Wandsworth, EV charger installation Bromley, fuse-board upgrade Croydon. You need pages built for each.
EV chargers are the fastest-growing search vertical in the trade. If your site doesn't have a dedicated EV-charger installation page with the right grant references (OZEV, Workplace Charging Scheme), you're invisible for it.
EICR demand is steady but margin-rich. Landlords need them every 5 years. Most electrician sites bury EICR three clicks deep instead of treating it as a primary service page.
Built around how people in the UK find electricians.
Pages built around the buyer's actual search
EICR, rewires, fuse-board upgrades, EV chargers, smart-home, emergency call-outs. Each is its own page with schema, internal links, and a call-to-action.
NICEIC / NAPIT / Part P done correctly
Your registration number, certifications, public liability cover, and warranty terms placed where Google and your customers expect them.
EV-charger pages built for the OZEV-grant searches
Dedicated EV-charger installation page targeting the fast-growing search vertical, including grant references and approved-installer status.
Borough-by-borough coverage that compounds
Each town or borough you serve gets a dedicated page over the year as part of monthly content. Coverage compounds month over month.
Call tracking on every page
You see which keyword and which page drove every phone call. The site improves based on data, not guesswork.
Three ways to invest. All start at £0.
First payment only triggers when your site is live and tracking is confirmed. Same team. Same standards. Different price point.
- Free 5-day build
- Hosting + ranking care included
- Cancel after 6 months · 30 days notice
- Free 5-day build
- Hosting + ranking care included
- Price locked 24 months
- Cancel after 12 months · 30 days notice
Why it costs more: full flexibility, zero lock-in.
- Free 5-day build
- Hosting + ranking care included
- Cancel any time · 30 days notice
From hidden specialist to obvious choice.
Inside three months, your phone is ringing from organic searches. EICR enquiries from landlords. EV-charger jobs from new electric-car owners. Rewires from the post-purchase property market. The Checkatrade subscription becomes optional.
You stop being the sixth result on a page nobody scrolls to and start being the obvious choice in the searches that matter for your area.
Electricians website FAQs.
£0 upfront. £197/mo + VAT (12-month plan), £297/mo + VAT (6-month), or £497/mo + VAT (no lock-in). Hosting, SEO, call tracking, monthly content, and reporting all bundled. First payment only after the site is live and tracking is verified.
Most builds rank top 10 for the trade + town keyword within 45-60 days of launch. The 90-day qualified-lead guarantee is in writing.
Yes. EV-charger installation is its own page with the OZEV / Workplace Charging Scheme references that customers search for. Dedicated schema markup. It's one of the fastest-growing electrical search verticals.
EICR has its own dedicated page targeting landlord-specific phrasing (<em>EICR landlord [town]</em>, <em>EICR certificate [town]</em>, <em>EICR cost [town]</em>). Landlords search for these every five years like clockwork.
Yes. NAP consistency, service categories, service areas, opening hours. Aligned with the website so the Map Pack and the organic listing reinforce each other.
Yes, after your minimum term (12 months on £197/mo, 6 months on £297/mo, none on £497/mo). Give 30 days written notice and you walk away with the site, the domain, and the code.
Free electricians website. 5 working days. 90-day lead guarantee.
Apply in 60 seconds. Written agreement in your inbox within 24 hours.